
Add to Cart
Stainless steel pipes are divided into seamless pipes and welded pipes according to the production method. Seamless steel pipes can be divided into hot-rolled pipes, cold-rolled pipes, cold-drawn pipes and extruded pipes. Cold-drawn and cold-rolled are the secondary types of steel pipes. Processing; welded pipe is divided into straight seam welded pipe and spiral welded pipe.
Product Name | 201 304 304L 316 316L seamless stainless steel pipe |
Standard | SUS ANSI ASTM EN A249 DIN Austenitic ASME AISI JIS A789 |
Out Diameter | 6-1024mm |
Thickness | 0.3-68mm |
Length | 1-6m or as cutomers required |
Steel Grade | 200 (Ni : 0.8%), 201B (Ni : 3%), 201H (Ni : 5%) |
| 301 (Ni : 6%), 304, TP304, TP304L/304L, 321, TP321, 316, TP316L, 316L, 316Ti |
| 317, 317L, 309S, 310S(2520), 347, Duplex 2205, Duplex 2207, etc. |
Standards | ASTM / ASME, GB, DIN, JIS, T14975, etc. |
round pipe/tube O.D.(mm) | 8, 9.5 , 12.7 , 15.9 , 17 , 18 , 19. 1 , 20 , 21 , 22.2 , 23 , 25.4 , 28 , 31.8 , 33, 35, 36, 38.1 , 40 , 41.8 , 42 , 45, 48 , 50, 50.8 , 56 , 57 , 60, 63.5 , 76.2 , 80 , 89 , 101.6 , 108 , 114 , 127 , 133 , 141 , 159 , 168, 219, etc. |
Application | industry,chemical,machinery,architec,decoration,etc |
Packing | 1.with plastic cap to protect both ends |
| 2.plastic bag wrapped outside the pipe |
| 3.bundles to be covered by polythene & strapped securely . |
| 4.if require ,then pack into wooden box. |
Certificate | ISO 9001:2008 |
Delivery time | 30-60 days depend on Quantity |
Payment Term | T/T, Irrevocable L/C at sight |
Trade Term | FOB , CFR , CIF |